8(800)3010-567(звонок бесплатный) | 1@artpot.ru

Development of urban concept
Development Project planning area
Development of facades and architectural concept
Design of capital construction
Center for Applied Urban
Design
Best projects workshop
South Quarter, New Vatutinki. Development of facades
Two-piece apartment building variable height
Three-storey house on 18 apartments
Apartment block variable height
Draft project of residential complex
A three-storey residential building with 60 apartments
main page| Design of capital construction

Design of capital construction

TRIZ methods in the design

Unsaleable area - less than 10%;
One-bedroom apartments - more than 80%;
The lack of ground and technical floors;
etc.
Application of TRIZ methods at the level of ODA (basic design decisions) allows non-trivial ways to significantly improve the main indicators.
 
+ 15% to the cost-effectiveness of the project development.

Quality
3D BIM

A new level of quality design solutions and project documentation can significantly reduce the amount of extra work and extra costs at the site.
 
Reducing the actual cost of construction by 10%

Spiral model

Consistent production of prototypes of varying degrees of detail allows to detect and solve engineering problems at all stages of the project.
 
We use effective methods of solving engineering problems.
 
Further reducing the cost of construction by 5%

The Result

Special techniques in the formulation and solution of design problems can significantly reduce the cost of construction.
 
Quality of project documentation makes construction more predictable and manageable, we reduce the risks.
 
We greatly reduces the actual cost of selling square meters.
< 20 000 rub/square meters - The cost of a normal * sold per square meter in an apartment building.
* - Take into account only the cost of the building.

Project Artpot Regular project
Special technique to identify and address cost-effective basic design decisions.

1:0

Replicated conventional solutions.
Special technique to identify and develop effective engineering solutions.

2:0

Use standard solutions that are effective in only half the cases.
Technology 3D BIM
A new level of quality 3D design documentation.
Engineers solve problems in 3D 3D virtual space, which are automatically extracted from all of the major figures.

3:0

Flat design
Engineers are engaged in manufacturing of flat drawings.
Nevyyavleny conflicts and errors.
The incompleteness of the data presented in the figures.
There is a risk of additional work and unaccounted spending on construction.
Comprehensive and uniform for all sections of 3D BIM model. Collisions and easily identify design errors, they can be seen in the literal sense of the word.
Qualitatively new level comprehensible working documents.
3D visualization of complex assemblies.

4:0

The flat design of conventional forces engineers - is by definition a low level of reasonableness consent of the different sections.
Difficult to check for collisions and design errors.
Increases the risk of additional work and unaccounted spending on construction.
The actual construction cost of the project corresponds to the (error 3%).
According to a quality project to build an easy to meet deadlines.
Construction is controllable and predictable, we reduce the risks.
The final cost of construction on our projects significantly below the market average.

5:0

High risk of significant excess of the estimated construction costs due to additional work and unaccounted for in the normal project costs.
High risk of increasing the period of construction. Follow rush jobs - the cause of new errors, alterations and unaccounted costs.
Qualitative assessment of labor costs and cost-effectiveness of the design organization
Method Artpot Conventional methods
Methods of organization design Artpot:
Search cost-effective basic design decisions, identifying and solving engineering problems require additional time. Moreover, the very 3D design requires much more time than flat. However, due to the parallel technique (pass-through) design we release a tremendous resource of working time is wasted in conventional design organizations in a recursive loop corrections of the project.
As a result, we are doing a project faster than usual.
The main feature of the usual methods of organization design:
Engineers weakly dependent of each other develop a strong relationship between design decisions. Minor fixes in one section generates a recursive cycle alterations, which occupies a large part of the working time of the project.
Then - predictably Abraham reason nedodumok and defects.
Draft project From 40 rubles/sq.m.
+ 15% to the cost-effectiveness of the project development.
Project From 300 rubles/sq.m.
Quality 3D BIM:
-10% Of the actual cost of construction by minimizing the additional work and unaccounted costs;
Additionally, 5% of the cost through effective engineering solutions.
Working documents From 400 rubles/sq.m.
A new level of quality clear project documentation, 3D visualization of complex assemblies.
Construction becomes more manageable and predictable process. Reduces the risk of the development project.
Vladimir Korbashov
Workshop leader Artpot

Compare ordinary domestic construction with the usual German.
An excellent illustration of the difference in the approaches to the organization of the process.
Our projects - a guide to action, they begin with the normal organization of construction.
Alexei Voronin
Chief engineer

I've spent on the construction of more than ten years. There is a "project" and "project, on which to build".
And then there is "The project on which to build a user-friendly". We produce such projects.
Sergei Borisovich
Chief architect

New technologies offer a new level of quality design solutions and project documentation. Result - reduced construction costs, better control and predictability of construction.
 
Two-piece apartment building variable height

Customer: Construction company "Morton"
Location of the property:
Moscow region, GO Balashikha, 28 km of motorway M7 "Volga", the north-eastern part of the quarter, "ray", block "A".


Three-storey house on 18 apartments

Customer: Construction company "Morton"
Location of the property:
Moscow region, GO Balashikha, 28 km of motorway M7 "Volga", the north-eastern part of the quarter, "ray", block "A".


Apartment block variable height

Customer: construction company "Elite Com"
Location of the property:
Moscow region, GO Balashikha, md. Saltykovka st. School, Quarter Europe


Draft project of residential complex

Customer: "Housing Mortgage Fund"
Location of the property:
Moscow region, Sergiyev Posad

14 464 square meters of selling 1 ha at 6 storeys and 9 floors.


A three-storey residential building with 60 apartments

Customer: The executive government
Location of the property:
Moscow region, Klin district, urban village Reshetnikovo


 

Наши клиенты

Исполнительные органы власти различного уровня Девелоперская компания "Мортон" Девелоперская компания
"RDI group"
Управляющая компания "Рекапстрой"
Девелоперская компания "Большой город - Девелопмент" Девелоперская компания "Ипотечный жилищный фонд" Управляющая компания
"ACCELERATION ENGINEERING"
©2015 Ltd. Artpot